← Back to Blog Articles

ยท 5 min read

The pain that slows teams down

When CI takes too long, teams stop trusting it. A single flaky test can waste hours of developer time and turn releases into a guessing game. The goal is fast, reliable signals that are easy to act on.

Changes that moved the needle

  1. Reduce noise first. Quarantine unstable tests and fix the top offenders.
  2. Shorten feedback loops. Split slow suites and run smoke tests on every PR.
  3. Make failures visible. Record screenshots, logs, and timing for each step.
  4. Assign owners. Every flaky test has a person and an expiration date.

Example: a simple quarantine label

labels:
  - name: flaky
    description: "Needs stabilization within 7 days"

What I measure each week

  • Median PR feedback time
  • Flaky rate by suite
  • Top three recurring failure signatures

Once these numbers are visible, it becomes much easier to keep CI healthy over time.